Fidelity – The Lost Dimension of the Iron Triangle

One the topics that I find a lot of people find particularly interesting and useful is that of Fidelity in software. This generally comes up while I’m talking about incrementing and iterating, and the difference between the two. I’ve already touched on this when discussed whether a Kanban System eschews iteration. This post will build on that, and describe what I mean by Fidelity.

The Iron Triangle of Project Management is a well known concept. There are a number of basic variables to project delivery; scope, cost and time. Not all these variable can be fixed, and generally quality is in the middle as another non negotiable variable.

Triangle

This can be related to a typical Agile Burndown, in that the Horizontal Axis is Time, the Vertical Axis is Scope, and the burndown slope is a function of cost and time. Keith Braithwaite and Joseph Pelrine both blogged about this after a conversation we had in Zurich earlier this year. I like to add a 3rd variable into that function that determines the slope – fidelity.

Burndown

Fidelity is similar to concepts I picked up from a number of places. One is Dimensional Planning where a number of different solutions are planned, each with a different level usability. A Dirt Road solution is the most basic, a Cobble Road solution is intermediate, and a Tarmac Road solution is the best.

Dimensional

Another source is Jeff Patton’s work, and in particular his approach to grading features. Similar to school or college work, each feature can be graded from A to F, where A is the best solution, and F is the least acceptable. Understanding how our customers perceive features in these terms, along with what the minimum acceptable grade is, helps with knowing when to continue working (and maybe come back later) or when to stop and move onto another feature. My colleague Simon Bennett refers to this a Balanced Scorecard technique.

Grades

So fidelity refers to the finesse of the feature, or solution. A low fidelity solution will be low in things like precision, granularity, or usability, but will still solve the original problem. As fidelity increases, so does the precision, granularity, usability etc. I prefer to make a distinction between fidelity and quality to avoid getting into discussions about compromising on quality. One recent project I was involved with talked about fidelity in terms of Rich, Richer and Richest.

Fidelity, as I have described above, can be useful when understanding the difference between incrementing and iterating, and how they can be effectively combined. We can consider 4 distinct approaches; Big Bang, Incremental, Iterative and Agile.

Big Bang

A Big Bang approach is neither iterative or incremental. Architectural components are built to full fidelity, for the full scope, and are fully integrated once at the end.

Big Bang 1

Big Bang 2

Big Bang 3

Incremental

The purely incremental approach builds each feature, across all components, to full fidelity, one by one.

Incremental 1

Incremental 2

Incremental 3

Incremental 4

Iterative

The purely iterative approach builds all the features, across all components, to the lowest fidelity, and then increases the fidelity to the highest level.

Iterative 1

Iterative 2

Iterative 3

Agile

An Agile approach combines the incremental and iterative approach by building each feature, one by one, at a low fidelity, and then both gradually adding features and increasing their fidelity until the right combination is achieved. Full fidelity is not always necessary.

Agile 1

Agile 2

Agile 3

Agile 4

Agile 5

Agile 6

It is by adding the Fidelity dimension into the mix that Agile projects can achieve the flexibility required to deal with typical scenarios where scope, cost and time become fixed, without resorting to cutting on quality. Fidelity provides a mechanism to effectively vary scope, while still meeting all the customers needs and solving their problems.